Describe ways that management can keep track of job status and location during production.

Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products—the Saturn microwave stand and the Gemini TV stand—have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age’s shop. Once set up and started, the lathe can run nearly unattended. How- ever, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been neces- sary to schedule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed’s foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed’s experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn’t shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week 1 2 3 4 5 6

Gemini 600 400 700 500 400 600

Saturn 300 400 400 600 300 300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equip- ment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassem- bly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. When- ever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week

Respond to the following and include any Materials Requirement Planning (MRP) calculations:

Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.
The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000.
Analyze the trade-off between overtime costs and inventory costs.
Calculate a new MRP that improves the base MRP.
Compare and contrast the types of production processing—job shop, batch, repetitive, or continuous—and determine which the primary mode of operation is and why.
Describe ways that management can keep track of job status and location during production.
Recommend any changes that might be beneficial to the company and/or add value for the customer.
The case study should demonstrate your understanding of the reading as well as the implications of new knowledge. The paper should integrate readings, scholarly sources, and class discussions into work and life experiences. It may include explanation and examples from previous events as well as implications for future applications.

The purpose of the case study is for you to culminate the learning achieved in the course by describing your understanding and application of knowledge in the field of operations management.

Homework Market
Calculate your paper price
Pages (550 words)
Approximate price: -

Why Homework Market

HomeworkMarket

Quality Researched Papers

We always make sure that writers follow all your instructions precisely. You can choose your academic level: high school, college/university or professional, and we will assign a writer who has a respective degree.

Homework Market

Qualified Writers

We have hired a team of professional writers experienced in academic and business writing. Most of them are native speakers and PhD holders able to take care of any assignment you need help with.

HomeworkMarket

Unlimited Revision

If you think we missed something, send your order for a free revision. You have 10 days to submit the order for review after you have received the final document. You can do this yourself after logging into your personal account.

HomeworkMarket

Timely Delivery

All papers are always delivered on time. In case we need more time to master your paper, we may contact you regarding the deadline extension. We will always strive to deliver on time.

HomeworkMarket

Original & Confidential

We use several writing tools checks to ensure that all documents you receive are free from plagiarism. Our editors carefully review all quotations in the text.

HomeworkMarket

Customer Support 24/7

Our support agents are available 24 hours a day 7 days a week and committed to providing you with the best customer experience. Get in touch whenever you need any assistance.

Try it now!

Calculate the price of your order

Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Homework Market

Place your order

Fill in the order form and provide all details of your assignment.

Homework Market

Proceed with the payment

Choose the payment system that suits you most.

Homework Market

Receive the final file

Once your paper is ready, we will email it to you.

Homework Market Writing Services

No need to work on essay at night. Sleep tight, we will cover your back. We offer all kinds of essay writing services.

HomeworkMarket HomeworkMrket

Essays

Essay Writing Services

No matter what kind of academic paper you need and how urgent you need it, you are welcome to choose your academic level and the type of your paper at an affordable price. We take care of all your paper needs and give a 24/7 customer care support system.

HomeworkMarket HomeworkMarket

Admissions

Admission Essays

An admission essay is an essay or other written statement by a candidate, often a potential student enrolling in a college, university, or graduate school. You can be rest assurred that through our service we will write the best admission essay for you.

HomeworkMarket HomeworkMarket

Editing

Essay Editing

Our academic writers and editors make the necessary changes to your paper so that it is polished. We also format your document by correctly quoting the sources and creating reference lists in the formats APA, Harvard, MLA, Chicago / Turabian.

HomeworkMarket HomeworkMarket

Research Paper

Research Paper

If you think your paper could be improved, you can request a review. In this case, your paper will be checked by the writer or assigned to an editor. You can use this option as many times as you see fit. This is free because we want you to be completely satisfied.