Soil In Construction Assignment

Our professional writers will address all you homework
requirements and provide a quality paper with guarantees of 100% plagiarism free.
We provide 24/7 customer Support.

Order Research Paper In a Few Clicks



Get my paper done

By clicking “Get my paper done”, you agree to our terms of service and privacy policy. We’ll occasionally send you promo and account related emails.

Soil In Construction Assignment

Soil In Construction Assignment Please see complete illustration in text book Soil in construction sixth edition Don C. Warrington W. L. Schroeder Figure 9.21 is representative of soil conditions at a construction site. If you are the contrac-tor, select a dewatering method you would consider appropriate for each of the projects described below. Consider the information given in this chapter, earlier chapters and any other information that may be appropriate. Describe in detail how your system would be built and operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter and how you should plan for them. a. A circular reservoir 100 ft in diameter is to be built with a bottom slab 25 ft below present ground surface. The groundwater level must be held

Soil In Construction Assignment
Please see complete illustration in text book
Soil in construction sixth edition Don C. Warrington W. L. Schroeder

  1. Figure 9.21 is representative of soil conditions at a construction site. If you are the contrac-tor, select a dewatering method you would consider appropriate for each of the projects described below. Consider the information given in this chapter, earlier chapters and any other information that may be appropriate. Describe in detail how your system would be built and operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter and how you should plan for them. a. A circular reservoir 100 ft in diameter is to be built with a bottom slab 25 ft below present ground surface. The groundwater level must be held at least 2 ft below the slab until the reservoir is filled. b. A bridge pier with a driven pile foundation is to be built with the bottom of the pile cap 40 ft below present grade. The cap is 20 ft by 30 ft in plan view
  2. 2. Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9.22. a. 1200 ft of an 18-in. sewer line is to be placed in a trench about 16 ft below ground surface. b. A 30-ft-diameter concrete pump station is to be founded on the basalt rock at 65 ft in depth. c. Conditions as in a, except that the pipeline is 28 ft below the ground surface.